VALUE CREATION SYSTEMS

Services

Make value creation repeatable—without adding headcount.

Click Get Started to get your free, anonymous executive value brief (no signups/obligations), or Choose Your Phase below (ACQUIRE, SCALE, EXIT) to explore modules to reach your goals.

Data & security

The Executive Value Brief is designed to be anonymous and low-risk. You can get a decision-ready frame without sharing sensitive data.

  • No PII required: don’t include names, customer data, employee data, or system credentials.
  • No uploads required: the brief can be generated from ranges and high-level inputs.
  • Use ranges: e.g., “$10–$20M EBITDA,” “5–10% churn,” “2–3 add-ons,” to keep inputs non-identifying.
  • If you want a client-specific version: we can run it under NDA with secure sharing (data room / encrypted transfer).

What it takes from your team

Minimal meetings. We do the heavy lift. Your job is to make the few key decisions on cadence.

Who participates

  • Sponsor: you (or PortCo CEO)
  • Operator lead: Head of Ops / COO / PM
  • Finance: CFO/FP&A (as needed)

Weekly rhythm

  • 60-min exec checkpoint
  • 1–2× 45-min working sessions
  • Async approvals & comments

Hours per week

  • Sponsor: ~0.5–1.5 hrs
  • Operator lead: ~2–5 hrs
  • CFO/FP&A: ~0–2 hrs

We’ll pull in functional owners (Sales, RevOps, IT, Security, etc.) only when a decision or data definition is required.

See an example Executive Value Brief (redacted)

Anonymous • < 3 minutes • No signup required

How to start

Executive framing—first.

Don’t buy a scope. Buy clarity on whether the value is real, where it comes from, and what has to be installed to capture it.

01 — Target value

What number are we trying to make true?

Define the outcome (EBITDA, cash, synergy, exit readiness) and the timeline.

02 — Drivers & levers

Where will the value actually come from?

Translate the target into value drivers and 1–3 levers with sizing and confidence.

03 — Controls & modules

What must be installed to capture it?

Decision rights, cadence, measurement, PMI governance, and (if needed) AI guardrails.

Decision checkpoint

Only then do we build the engagement.

Pick the smallest timeboxed module that installs the controls needed for the levers.

If the Executive Value Brief doesn’t produce a credible target, drivers, and levers—don’t proceed. If it does, the rest of this page shows exactly how we install the controls to make it repeatable.

PROOF

Case studies

Click a card to see what we installed and the measurable outcome.

ACQUIRE Leading U.S. Home Building Materials Manufacturing ~$5.8B enterprise value (go-private)
Outcome
Fixed in 3 months what hadn’t been fixed for years — $40M–$60M annual savings (conservative), standardized SLAs, escalations reduced to zero.
What we installed
Playbooks, systems analysis, policy enforcement, team training, and a repeatable operating cadence.
SCALE U.S. Regional Consumer Credit Platform ~$1B potential valuation (press)
Outcome
Replaced a failing service desk via full RFP + integration — >$1M/yr direct savings to EBITDA, CSAT 30% → 95%, and 24x7x365 coverage.
What we installed
Vendor selection (RFP), onboarding + integration, and the service operations governance to keep performance stable.
SCALE U.S. Fortune 50 Bank ~$280B market cap (Jan 2026)
Outcome
Removed workflow bottlenecks + tightened controls — faster publishing with higher quality controls and faster file compilation.
What we installed
Governance across stakeholders, UX restructuring, and throughput controls across the publishing workflow.
ACQUIRE U.S. Aerospace Engineering ~$19B market cap (Jan 2026)
Outcome
In preparation for a major acquisition, created multiple playbooks and architected 15+ workflow upgrades across the CISO and IT Operations org to standardize execution, tighten governance, and reduce integration risk.
What we installed
Repeatable playbooks + workflow architecture upgrades to make security + operations execution predictable under change.

Why lower middle market sponsors use us

LMM deals win on speed, focus, and clean execution—often with limited back-office maturity and thin management bandwidth. We install the operating logic that makes performance repeatable through growth, add-ons, modernization, and selective AI adoption.

Built for lean teams

Minimal meetings. Maximum clarity.

We reduce noise and force decisions into a cadence management can run.

  • Decision checkpoints, not status updates
  • Templates that management can actually maintain

Founder → professional

Durable execution beyond personalities.

Explicit ownership and thresholds that survive leadership changes.

  • Decision rights + escalation paths
  • Clean KPI definitions and owners

Add-on repeatability

Lower integration variance.

PMI governance that standardizes workstreams without consultant bloat.

  • Workstream cadence + reporting pack
  • Dependency + risk visibility

What we install: the Execution Control Plane

Decision rights + escalation architecture

DRI/RACI, exception thresholds, governance rules.

Operating cadence that holds

KPI/forecast/risk rhythms tied to real decisions.

Accountability systems

Scorecards, clean assumptions, chain-of-custody metrics.

PMI operating playbooks

Day 1 → steady state; integration governance to reduce variance.

Automation / AI-ready governance

Guardrails, use-case portfolio governance, policy-as-code thinking.

ACQUIRE

Pre-close clarity. Post-close certainty.

Lower middle market deals don’t lose because the thesis is wrong—they lose because execution depends on personalities and bandwidth. We translate the target value into drivers and 1–3 levers, then install the controls that make those levers real on Day-1: clear decision rights, KPI definitions, escalation thresholds, and a cadence management can actually run. The result is an IC-ready view of what must be true, what could break, and the smallest timeboxed engagement that turns the thesis into an owned 100-day plan—especially for add-ons and integrations.

1–3 weeks

IC-Ready Diligence Pack

De-risk the decision and set up Day-1 execution.

  • Red flags + mitigations
  • KPI baseline + definitions
  • Must-be-true list + draft 100-day blueprint

2–3 weeks

Value Creation Blueprint

Turn the thesis into owned initiatives with metrics.

  • Thesis → initiative map
  • EBITDA bridge logic + benefits method
  • Owners, milestones, metrics + decision rights

2–3 weeks

PMI Governance Blueprint

Standardize integration to reduce variance (add-ons).

  • Workstreams + thresholds
  • Day-1/30/100 plan + dependencies
  • Integration scorecard + RAID + cadence

SCALE

Install cadence that survives bandwidth constraints.

Once you own the platform, value creation becomes a systems problem: forecasting drift, priority churn, and reports without decisions. We install an operating cadence that holds—KPI definitions, owners, thresholds, and an executive rhythm tied to actual decision checkpoints. Then we translate the value drivers and levers into a runable initiative system (without building a full Value Creation Office): benefit logic, milestones, and a simple tracking method that keeps the portfolio aligned. For add-on strategies, we standardize the integration cadence so each acquisition improves the next.

2–4 weeks

Operating Cadence Install

Turn reporting into repeatable decisions.

  • KPI tree + definitions + owners
  • Exec agenda + decision log
  • Forecast rhythm + escalation rules

4–8 weeks

Value Creation Office (Lite)

Run initiatives + benefits without building a big VCO.

  • Initiative system + benefits logic
  • EBITDA bridge tracking methodology
  • Portfolio reporting template + cadence

2–6 weeks

AI / Automation Governance + Enablement

Process-first, tool-second. Ship AI safely.

  • Use-case portfolio + prioritization rules
  • Guardrails + review gates + ownership
  • Adoption cadence + measurement

EXIT

Buyer-grade metrics. Evidence-linked story.

Exits rarely fail on performance alone—they fail on credibility: inconsistent KPI definitions, unclear data lineage, and a narrative that isn’t provable under pressure. We install buyer-grade metric chain-of-custody (definitions, owners, source of truth) and package the story with evidence links so diligence compresses instead of expands. We also route Q&A with clear owners and a weekly cadence so management bandwidth doesn’t collapse mid-process. If KPI discipline is the blocker, we install the operating cadence first so the numbers stay stable through the process.

2–4 weeks

Exit Readiness Control Pack

Cleaner data, cleaner story, fewer surprises.

  • Buyer-grade KPI pack + definitions
  • Evidence links + narrative support
  • Q&A routing + weekly cadence

2–4 weeks

Operating Cadence Install

Stabilize KPIs through process.

  • KPI definitions + owners
  • Reporting rhythm + decision checkpoints
  • Thresholds + escalation paths

TRACEABILITY

Map Target Value → Install Modules

Start with the target → open the driver → pick the smallest install module. Add the AI Overlay (optional) once controls exist.

VALUE DRIVER Commercial Growth Target: ↑ EBITDA / growth Pricing • Pipeline • Retention

Common levers

  • Pricing / packaging discipline
  • Pipeline stage hygiene + conversion
  • Retention / churn + renewal motion

Controls we install

  • Definitions: pipeline stages, win-rate, churn
  • Cadence: weekly pipeline + pricing exceptions
  • Decision rights: discount thresholds, approval paths

Recommended install

Commercial Engine Install

AI Overlay (optional)
VALUE DRIVER Gross Margin Target: ↑ EBITDA / margin COGS • Labor • Mix • Variance

Common levers

  • Cost baselines + variance control
  • Labor productivity / scheduling
  • Mix + pricing realization

Controls we install

  • Baseline + bridge: price/volume/mix/cost
  • Cadence: weekly margin/variance review
  • Decision thresholds: spend, staffing, scrap

Recommended install

Margin & Delivery Install

AI Overlay (optional)
VALUE DRIVER SG&A Efficiency Target: ↑ EBITDA / efficiency Spend controls • Org design

Common levers

  • Vendor rationalization + contract discipline
  • Org design / spans & layers
  • Benefits tracking (EBITDA bridge)

Controls we install

  • Spend categories + approval thresholds
  • Cadence: weekly spend + benefits review
  • Owner/DRI model for each cost pool

Recommended install

SG&A & Spend Control Install

AI Overlay (optional)
VALUE DRIVER Cash & Working Capital Target: ↑ cash / deleveraging AR • AP • Inventory

Common levers

  • Collections motion + dispute triage
  • Payables cadence + terms discipline
  • Inventory targets + exception control

Controls we install

  • Definitions: DSO/DPO/DIO + targets
  • Cadence: weekly cash war room
  • Decision thresholds: credit holds, terms

Recommended install

Cash & Working Capital Install

AI Overlay (optional)
VALUE DRIVER Integration / Add-ons (PMI) Target: ↑ synergy capture Repeatable add-on PMI

Common levers

  • PMI governance + Day-100 plan
  • Standardization (process, systems, KPI)
  • Synergy sizing + benefits tracking

Controls we install

  • Decision rights + integration thresholds
  • Cadence: weekly PMI operating review
  • Workstream owners + KPI chain-of-custody

Recommended install

Integration / Add-on Install

AI Overlay (optional)
VALUE DRIVER Exit Readiness / Multiple Hygiene Target: ↑ buyer confidence KPI definitions + proof

Common levers

  • Buyer-grade KPI pack + evidence links
  • Q&A routing + response cadence
  • Narrative consistency (bridge to value)

Controls we install

  • Metric definitions + ownership
  • Chain-of-custody for source data
  • Cadence: weekly diligence readiness

Recommended install

Exit Readiness Install

AI Overlay (optional)
VALUE DRIVER Automation / AI Enablement Target: ↑ speed + quality Governance before tools

AI isn’t a standalone transformation here. It’s an overlay that accelerates workflows once definitions, decision rights, and cadence are installed.

AI Overlay (optional) Exception triage Classification + routing Drafting + summaries

If you want “tools-first,” we’ll tell you no. Governance first creates the ROI.

CATCH-ALL Special Situations Carve-out / TSA ERP/CRM transitions Compliance / cyber

When the constraint is complexity or risk (not just EBITDA math), we install the governance and workflows required to keep the deal moving.

Recommended install

Special Situations Install

Engagement Models

Start small, ship real deliverables, expand only if it’s working.

Sprint

1–3 weeks

  • One module
  • Fixed timeline
  • Decision-ready output

Project

4–10 weeks

  • Multi-workstream delivery
  • Governance + exec reporting
  • Install the cadence

Fractional Value Creation Office (VCO)

Monthly

  • Weekly operating cadence
  • Benefits tracking
  • Add-on PMI standardization

FAQ

Will this overload our management team?

No. This is designed around management bandwidth. We reduce meetings, clarify decisions, and standardize reporting.

Do you work with founder-led teams?

Yes. We translate informal decision-making into explicit thresholds, owners, and cadence—without breaking the culture.

We’re doing add-ons—can this become repeatable?

Yes. We standardize the PMI governance model and reporting pack so each add-on improves the next.

How fast can you start?

If stakeholders and data are available, we can start within days and deliver the first decision artifact inside the first cycle.

Is this confidential?

Yes. NDAs and controlled access are standard.

EXECUTIVE VALUE BRIEF

What you get (in one cycle)

A decision-ready brief that translates your target into value drivers, levers, and the smallest module set required to capture it—built for LMM speed and management bandwidth.

If the brief doesn’t produce a credible target, drivers, and levers—don’t proceed. If it does, the Services map shows exactly how we install the controls to capture the value.

See an example Executive Value Brief (redacted)

Anonymous • < 3 minutes • No signup required